Whatever the rights and wrongs of the Slip Bridge saga, it is now in its new foreshore home at a cost, I understand, in excess of £100,000. What a pity then that a few coppers could not be found for doing the job properly.

The ground on one side of it has been roughly seeded over with grass with a deep bed of gravel and stones still in situ from construction work. What a mess! If a job is worth doing . . . as they say.